Skip to main navigation Skip to search Skip to main content

A DEA Game Cross-Efficiency Model with Loss Aversion for Contractor Selection

  • Huixia HUANG*
  • , Chi ZHOU
  • , Hepu DENG
  • *Corresponding author for this work

Research output: Journal PublicationsJournal Article (refereed)peer-review

Abstract

Evaluating and selecting appropriate contractors is critical to the success of specific construction projects in the building industry. Existing approaches for addressing this problem are unsatisfactory due to the ignorance of the multi-dimensional nature of the evaluation process and inappropriate consideration of existent risks. This study presents a DEA game cross-efficiency model with loss aversion for evaluating and selecting specific contractors. The competitiveness of the evaluation process is modeled using game theory with respect to the adoption of the cross-efficiency model. The attitude of the decision maker toward risks is tackled with the use of loss aversion, which is a phenomenon formalized in prospect theory. As a result, the proposed approach can adequately screen available contractors through prequalification and adequately consider the attitude of the decision maker toward risks, leading to effective decisions being made. An example is presented to demonstrate the applicability of the proposed model in evaluating and selecting appropriate contractors for specific construction projects. The results show that the proposed model is effective and efficient in producing a unique solution for contractor selection through appropriate modeling of the multi-dimensional contractor selection process and adequate consideration of the competition between the contractors and the attitude of the decision maker toward risks in practical situations.

Original languageEnglish
Article number1519
Number of pages18
JournalMathematics
Volume12
Issue number10
DOIs
Publication statusPublished - 2 May 2024
Externally publishedYes

Funding

This research was supported by Guangdong Provincial Philosophy and Social Sciences Plan 2022 Project (No. GD22XYJ21) (the Impact, Mechanism, and Path of Digital Infrastructure Facilitating High-Quality Economic Development in the Guangdong–Hong Kong–Macao Greater Bay Area).

Keywords

  • contractor selection
  • cross efficiency
  • game theory
  • loss aversion

Fingerprint

Dive into the research topics of 'A DEA Game Cross-Efficiency Model with Loss Aversion for Contractor Selection'. Together they form a unique fingerprint.

Cite this