Abstract
The cement manufacturing sector is the second largest source of anthropogenic greenhouse gas emissions in the world. Carbon Capture and Storage (CCS) is one of the most important technologies to decarbonise the cement manufacturing process. China has accounted for more than half of global cement production since 2008. This study suggests criteria to assess the potential to retrofit cement plants and analyses the economics of retrofitting cement plants for CCS with a case study of a modern dry process cement plant locating in Guangdong province, China. The study assumes the extra heat and power for CO2 capture and compression is provided by a new 200 MW combined heat and power unit (CHP) (US$17.5/MW h thermal for the cost of coal). The estimated cost of CO2 avoidance by retrofitting a cement plant for carbon capture in 2012 is US$70/tonne at a 14% discount rate with 25 years remaining lifetime. Through a stochastic cash flow analysis with a real option model and Monte Carlo simulation, the study found the value of an option to retrofit to be US$1.2 million with a 7.3% probability of economic viability. The estimate is very sensitive to the assumptions in the carbon price model (i.e. base carbon price is US$12.00/tCO2e in 2012 and the mean growth rate is 8%). The option value and the probability can reach US$20 million and 67% respectively, if a 10% mean carbon price growth is assumed. Compared with post-combustion carbon capture retrofitting prospect in existing coal-fired power plants, the economics of retrofitting cement plants to carbon capture is less attractive. However, given the uncertainties in climate policy, regulation and carbon market, new-build cement plants in China, with long lifetime, should consider an essential level of "CCS Ready" to reduce the cost of retrofit and keep the retrofitting option open.
Original language | English |
---|---|
Pages (from-to) | 454-465 |
Number of pages | 12 |
Journal | Energy Conversion and Management |
Volume | 64 |
Early online date | 1 Oct 2012 |
DOIs | |
Publication status | Published - Dec 2012 |
Externally published | Yes |
Bibliographical note
The authors would like to thank Dr. Pradeep Tharakan, Climate Change Specialist, Asian Development Bank (ADB) for detail review comments on an earlier manuscript. A portion of the literature review presented in the paper was undertaken by Dr. Jia Li under a contract with the ADB (Technical Assistance Program 7575: Determining the Prospects for CCS in Southeast Asia). Special thanks to Mr Philip Curry and two anonymous reviews for valuable revision advice.
Funding
We acknowledge financial support by the UK Foreign and Commonwealth Office (FCO) and the Australia Global Carbon Capture and Storage Institute (GCCSI) through the Guangdong CCS Readiness Project (GDCCSR) for developing industrial network. We also acknowledge colleagues from China Century Cement Limited of China Resources Cement Holding for providing access to plant design and operational data.
Keywords
- Cement
- China
- CO capture
- Economics
- Finance
- Optimisation
- Retrofit