Financing new power plants 'CCS Ready' in China - A case study of Shenzhen city

Jia LI, Xi LIANG*, David REINER, Jon GIBBINS, Mathieu LUCQUIAUD, Hannah CHALMERS

*Corresponding author for this work

Research output: Journal PublicationsJournal Article (refereed)peer-review

6 Citations (Scopus)

Abstract

We evaluate the benefits of a 'CCS Ready Hub' approach, a regional 'CCS Ready' strategy, which not only includes a number of new coal-fired power plants but also integrates other existing stationary CO2 emissions sources, potential storage sites and potential transportation opportunities into an overarching simulation model. A dynamic top-down simulation model was built based on economic decision criteria and option pricing theory. The model inputs and assumptions build on spatial sampling and analysis using a geographic information system (GIS) approach, engineering assessment of local projects and outputs of a CCS retrofitting investment evaluation through cost cash flow modelling. A case study of Shenzhen city in the Pearl River Delta area in Guangdong in southern China is presented, based on engineering and cost assessment studies and stakeholder consultations and building on existing geological surveys and infrastructure plans. The simulation results show that financing 'CCS Ready' at regional planning level rather than only at the design stage of the individual plant (or project) is preferred since it reduces the overall cost of building integrated CCS systems. On the other hand, we found the value of considering existing stationary CO2 emissions sources in CCS ready design. Therefore, we recommended that making new plants CCS ready or planning a CCS ready hub should consider existing large emissions sources when possible.

Original languageEnglish
Pages (from-to)2572-2579
Number of pages8
JournalEnergy Procedia
Volume4
Early online date1 Apr 2011
DOIs
Publication statusPublished - 2011
Externally publishedYes

Funding

We acknowledged financial support through Guangdong CCS ready (GDCCSR) project funded by UK FCO and Australia GCCSI, Chinese Advanced Power Plant Carbon Capture Options (CAPPCCO) project by UK DECC. Thanks to colleagues in Shenzhen Baochang Power, Shenzhen Energy, Shenzhen Gas, CNOOC and Linkschina Investment for their kind support.

Keywords

  • Capture ready
  • Carbon capture and storage
  • CCS ready
  • China
  • Finance

Fingerprint

Dive into the research topics of 'Financing new power plants 'CCS Ready' in China - A case study of Shenzhen city'. Together they form a unique fingerprint.

Cite this