Optimal scheduling for wind farms power generation based on partial information

Research output: Book Chapters | Papers in Conference ProceedingsConference paper (refereed)Researchpeer-review

2 Citations (Scopus)

Abstract

This paper aims to solve the coupled problem of wind farms modeling and wind power generation optimal scheduling. The salient features of the proposed method are as follows: First, the multi-agent model of wind farms power generation is obtained, which consider the influence among wind turbines. Second, the task is formulated as an optimization scheduling problem in terms of wind power generation. Third, the controller is designed by considering the partial system information, and solved based on the Forward & Backward Stochastic Different Equations (FBSDE) and adjoint equations. Numerical simulations are adopted to verify the proposed optimization method for partial information cases.
Original languageEnglish
Title of host publicationProceedings of the 34th Chinese Control Conference, CCC 2015
EditorsQianchuan ZHAO, Shirong LIU
PublisherIEEE
Pages8941-8946
Number of pages6
ISBN (Electronic)9789881563897
DOIs
Publication statusPublished - Jul 2015
Externally publishedYes
Event34th Chinese Control Conference, CCC 2015 - Hangzhou, China
Duration: 28 Jul 201530 Jul 2015

Conference

Conference34th Chinese Control Conference, CCC 2015
Country/TerritoryChina
CityHangzhou
Period28/07/1530/07/15

Keywords

  • backward stochastic different equation
  • optimal scheduling
  • Partial information
  • synchronization
  • wind farms

Fingerprint

Dive into the research topics of 'Optimal scheduling for wind farms power generation based on partial information'. Together they form a unique fingerprint.

Cite this