Single-machine scheduling with advanced process control constraints

Yiwei CAI, Erhan KUTANOGLU, John HASENBEIN*, Joe QIN

*Corresponding author for this work

Research output: Journal PublicationsJournal Article (refereed)peer-review

18 Citations (Scopus)

Abstract

With increasing worldwide competition, high technology manufacturing companies have to take great care to lower their production costs and guarantee high quality at the same time. Advanced process control (APC) is widely used in semiconductor manufacturing to adjust machine parameters so as to achieve satisfactory product quality. When there is a conflict between quality and scheduling objectives, quality usually takes precedence. This paper studies the interaction between scheduling and APC. A singlemachine multiple-job-types makespan problem with APC constraints is proved to be NP-hard. For some special cases, optimal solutions are obtained analytically. In more general cases, the structure of optimal solutions is explored. An efficient heuristic algorithm based on these structural results is proposed and compared to an integer programming approach. © Springer Science+Business Media, LLC 2010.
Original languageEnglish
Pages (from-to)165-179
Number of pages15
JournalJournal of Scheduling
Volume15
Issue number2
Early online date29 Dec 2010
DOIs
Publication statusPublished - Apr 2012
Externally publishedYes

Bibliographical note

This research was supported by a National Science Foundation grant under DMI-0432433 and the members of the Texas-Wisconsin-California Control Consortium.

Keywords

  • Advanced process control
  • Setups
  • Single machine scheduling

Fingerprint

Dive into the research topics of 'Single-machine scheduling with advanced process control constraints'. Together they form a unique fingerprint.

Cite this